Post concrete 20kg
- Setting will occur in within 10-15Â minutes (under normal weather conditions).
- 10mm Coarse Aggregate
- Sealed in a showerproof bagÂ
- Bag Size 20kgÂ
- We recommend 1.5 bags for timber posts and 2 bags for concrete
Instructions
1. Dig a hole to the correct dimensions according to the post size. Fill the hole halfway with water and position the post vertically in the hole.
2. Pour Post Concrete into the hole ensuring to pour evenly around the post, up to the water surface. If any dry powder is still visible sprinkle with water.
3. Immediately adjust the level and position of the post as required and support in this position for approximately 5 minutes or until setting begins.
4. Lightly tap the surface of the Post Concrete to remove any air bubbles and when setting
Standard shipping
Estimated delivery time: 7-10 days